Kajima - Hoa Binh handed over Aeon Mall tỷ lệ trực tiếp bóng đá project earlier than the plan
news
After 25 months of construction, Kajima - Hoa Binh general contractor has just handed over AEON MALL tỷ lệ trực tiếp bóng đá to AEONMALL Vietnam in order to launch this shopping mall.
On 05/12/2019, AEON MALL tỷ lệ trực tiếp bóng đá was officially opened. This is the largest shopping mall of AEON Group in Vietnam, invested by AEONMALL Vietnam Limited Company. - Hoa Binh Joint Venture is the general Design and Build (D&B) contractor. The construction time is 25 months.

With the super-fast construction speed of the contractor, Aeon Mall tỷ lệ trực tiếp bóng đá was opened and put into operation.
tỷ lệ trực tiếp bóng đá shopping mall includes 1 basement, 1 ground floor, and 3 floors with total construction area of more than 150,000 m2. This is one of the projects which Kajima - Hoa Binh general contractor has constructed with super-fast construction speed.

Mr. Le Viet Hai – Chairman cum CEO of Hoa Binh (the second one from the right) is performing the opening formality.
With its eco-friendly green design and modern technology, AEON MALL tỷ lệ trực tiếp bóng đá is considered as one of the largest shopping malls in Vietnam, and an ideal destination in the West of Hanoi.
Tin liên quan
Cất nóc tháp Orchid dự án Hado Centrosa...
Sáng 5/10/2017, Tập đoàn Xây dựng tỷ lệ soi kèo bóng đá và Tập đoàn Hà Đô đã cất nóc tòa tháp Orchid...
Công trình Plot A5 Diamond Alnata cất nóc...
Sáng 23/04/2022, Tập đoàn Xây dựng tỷ lệ soi kèo bóng đá đã cất nóc công trình Plot A5 Diamond Alnata thuộc dự...
Khởi công dự án Sora Gardens 1 trị giá...
Sáng ngày 01/07/2013, Công ty CP Xây dựng và Kinh doanh địa ốc tỷ lệ soi kèo bóng đá đã tổ chức lễ khởi...


